Catalyst and Erith, our demolition partners, are in the process of demolishing some of the existing buildings in Phase 2. The buildings are 65-96 Pepler House, Edward Kennedy House and 192 & 194 Wornington Road.

Demolition is expected to last until the end of May this year. During demolition, the footpath adjacent to the site is closed, with new crossings provided as shown on the plan above. Erith’s traffic marshals will continue to manage all construction traffic entering and leaving the site to ensure safety at all times. Site hoardings and a protective scaffold and screen have been installed around the buildings to keep the site and the public safe.

If you have any questions about the demolition process, please contact Catalyst’s Customer Services team on 0300 456 2099.

Demolition works are necessary, but we appreciate that they can cause some disruption for residents. Erith are committed to taking all practical measures, over and above local authority requirements, to minimise disturbance.

These include:

  • Directing water jets at sources of dust, and regular dampening of the ground
  • Fully enclosing buildings with scaffold and sheeting to reduce noise and contain dust and debris
  • Covering all vehicles to ensure debris being removed from site is contained
  • Staggering particularly noisy works to give neighbours a break.